Overview
Help the city find, report and fix water leaks faster across its suburbs.
- Posted by
- Local authority · Bulawayo
- Location
- Bulawayo (one pilot suburb)
- Sub-theme
- Smart Cities & Urban Innovation
- Team size
- 2–6 people
- Pilot budget
- Pilot budget on request
- Applications close
- 20 Dec 2026
The problem
Background
The city loses a large share of its treated water to leaks and bursts in an ageing pipe network. Residents report leaks by phone or in person, and the reports are logged by hand.
What's going wrong
Many leaks go unreported, while others are reported several times by different people. Repair crews lack exact locations and priorities, so repairs take days and water rationing gets worse.
What we need
A strong solution will:
- Make it easy for residents to report a leak with a location and a photo.
- Merge duplicate reports and rank leaks by severity.
- Give crews a daily job list and track repair times.
- Show residents what has been fixed.
Constraints
- Reporting must work over WhatsApp or USSD as well as smartphones.
- Must run on the city’s existing servers or a low-cost hosted plan.
- Residents’ personal data must be protected.
Deliverables
By forum week, matched teams are expected to bring:
- A working reporting and job-tracking prototype.
- A test with one suburb and one repair crew.
- Running costs and a rollout plan.
- A seven-minute pitch for forum week.
How teams are evaluated
Applications and final pitches are scored by the challenge owner and the ZBIF secretariat on:
-
Fit to the problem30%
Does it solve the problem as the challenge owner describes it?
-
Technical feasibility25%
Can the team build and run it with the resources available?
-
Cost and scalability20%
Is it affordable to pilot, and to roll out if the pilot works?
-
Team capability15%
Does the team have the skills and time to deliver?
-
Local impact10%
Jobs, skills or value it keeps in Zimbabwe.
Who can apply
- A registered ZBIF innovator account: innovators, consultancies, technologists, university teams or freelancers.
- At least one team member based in Zimbabwe.
- Able to attend forum week in Bulawayo on 27–28 April 2027 if shortlisted.
- IP ownership and pilot terms are agreed between your team and the challenge owner in the Deal Room.
Timeline
- 25 Sep 2026 Challenge posted We are here
- 20 Dec 2026 Applications close
- Within 3 weeks Matching results sent to teams and the challenge owner
- Until mid-April 2027 Build phase, with mentor and challenge-owner check-ins
- 27–28 Apr 2027 Live pitch and Deal Rooms at forum week, Bulawayo
Data and resources
Shared with matched teams after signing a simple data-use agreement.
-
Water network maps (GIS) for pilot suburbs Shapefiles
-
Past leak report logs Spreadsheet
-
Engineering department contact Fortnightly check-in
Questions about this brief?
Sign in to ask the challenge owner. Answers are shared with every applicant.