A large mining haul truck on red earth at an open-pit mine
Open 56 days to apply
Mining & Resource Efficiency

Predict haul-truck breakdowns before they stop production

Mining operator · Midlands

Overview

Flag failing haul-truck components early enough to schedule repairs before they cause unplanned downtime.

Posted by
Mining operator · Midlands
Location
Midlands Province (site visits available)
Sub-theme
Mining & Resource Efficiency
Team size
2–6 people
Pilot budget
US$20,000
Applications close
15 Dec 2026
  • IoT sensors
  • Machine learning
  • Hardware

The problem

Background

The operator runs a fleet of 18 rigid haul trucks at an open-pit mine in the Midlands, most of them more than 12 years old. Maintenance is mostly reactive: trucks are repaired after they fail, often far from the workshop.

What's going wrong

A breakdown takes a truck out of the haul cycle for two to five days and leaves loading equipment idle. The maintenance team already logs engine hours, oil analysis results and fault codes, but the data sits in spreadsheets and nobody has time to look for patterns.

What we need

A strong solution will:

  • Predict likely component failures (engine, transmission, final drives, tyres) at least 7 days ahead.
  • Use the data the mine already collects, adding low-cost sensors only where they clearly pay off.
  • Give the maintenance planner a simple weekly view of which trucks are at risk.
  • Run on site with patchy connectivity.

Constraints

  • Must work offline and sync when the connection returns.
  • No changes to manufacturer control systems without their approval.
  • Any hardware must be rated for dust and heavy vibration.

Deliverables

By forum week, matched teams are expected to bring:

  1. A working prototype tested on the historical fleet data.
  2. A short report on prediction accuracy and false alarms.
  3. A costed plan for a three-month pilot on four trucks.
  4. A seven-minute pitch for forum week.

How teams are evaluated

Applications and final pitches are scored by the challenge owner and the ZBIF secretariat on:

  • Fit to the problem30%

    Does it solve the problem as the challenge owner describes it?

  • Technical feasibility25%

    Can the team build and run it with the resources available?

  • Cost and scalability20%

    Is it affordable to pilot, and to roll out if the pilot works?

  • Team capability15%

    Does the team have the skills and time to deliver?

  • Local impact10%

    Jobs, skills or value it keeps in Zimbabwe.

Who can apply

  • A registered ZBIF innovator account: innovators, consultancies, technologists, university teams or freelancers.
  • At least one team member based in Zimbabwe.
  • Able to attend forum week in Bulawayo on 27–28 April 2027 if shortlisted.
  • IP ownership and pilot terms are agreed between your team and the challenge owner in the Deal Room.

Timeline

  1. 28 Sep 2026 Challenge posted We are here
  2. 15 Dec 2026 Applications close
  3. Within 3 weeks Matching results sent to teams and the challenge owner
  4. Until mid-April 2027 Build phase, with mentor and challenge-owner check-ins
  5. 27–28 Apr 2027 Live pitch and Deal Rooms at forum week, Bulawayo

Data and resources

Shared with matched teams after signing a simple data-use agreement.

  • Maintenance logs and fault codes, 2023–2026 Spreadsheet, anonymised
  • Oil analysis reports for the current fleet PDF reports
  • Site visit for matched teams By arrangement
  • Maintenance engineer as point of contact Weekly check-in
Full challenge brief Everything on this page as a PDF to share with your team.
Download PDF

Questions about this brief?

Sign in to ask the challenge owner. Answers are shared with every applicant.

Ask a question
US$20,000Open to apply
Apply