Factory energy load shedding playbook
Open
AI & Digital Transformation

Factory energy load shedding playbook

Food processor · Bulawayo

Overview

Load shedding scrapes productivity. We need a scheduling tool that reorders shifts and high-draw machines around outage windows using ZESA schedules and generat

Posted by
Food processor · Bulawayo
Location
Bulawayo (factory access for matched teams)
Sub-theme
AI & Digital Transformation
Team size
2–6 people
Pilot budget
Pilot budget on request
Applications close
Open
  • Manufacturing
  • Green Energy & Sustainability

The problem

Background

Load shedding scrapes productivity. We need a scheduling tool that reorders shifts and high-draw machines around outage windows using ZESA schedules and generator cost.

What's going wrong

Load shedding scrapes productivity. We need a scheduling tool that reorders shifts and high-draw machines around outage windows using ZESA schedules and generator cost.

What we need

A strong solution will:

  • Pilot on one plant line with measurable reduction in scrap and overtime.

Constraints

  • Must use existing MES/Excel inputs
  • plant managers approve overrides.

Deliverables

By forum week, matched teams are expected to bring:

  1. A working prototype or demonstrable approach.
  2. Evidence of fit to the problem and constraints.
  3. A costed plan for a pilot.
  4. A seven-minute pitch for forum week.

How teams are evaluated

Applications and final pitches are scored by the challenge owner and the ZBIF secretariat on:

  • Fit to the problem30%

    Does it solve the problem as the challenge owner describes it?

  • Technical feasibility25%

    Can the team build and run it with the resources available?

  • Cost and scalability20%

    Is it affordable to pilot, and to roll out if the pilot works?

  • Team capability15%

    Does the team have the skills and time to deliver?

  • Local impact10%

    Jobs, skills or value it keeps in Zimbabwe.

Who can apply

  • A registered ZBIF innovator account: innovators, consultancies, technologists, university teams or freelancers.
  • At least one team member based in Zimbabwe.
  • Able to attend forum week in Bulawayo on 27–28 April 2027 if shortlisted.
  • IP ownership and pilot terms are agreed between your team and the challenge owner in the Deal Room.

Timeline

  1. 19 Oct 2026 Challenge posted We are here
  2. Rolling Applications close
  3. Within 3 weeks Matching results sent to teams and the challenge owner
  4. Until forum week Build phase, with mentor and challenge-owner check-ins
  5. Forum week Live pitch and Deal Rooms in Bulawayo

Data and resources

Shared with matched teams after signing a simple data-use agreement.

  • Challenge owner point of contact After matching
  • Operational context pack Shared under data-use agreement
Full challenge brief Everything on this page as a PDF to share with your team.
Download PDF

Questions about this brief?

Sign in to ask the challenge owner. Answers are shared with every applicant.

Ask a question
Pilot budget on requestOpen to apply
Apply